Port Klang Distribution Hub
- Scope
- Three-span portal frame warehouse
- Steel
- 1,240 tonnes
Services
Portal frames, multi-storey frames, transfer beams, pipe racks and platforms, fabricated in our yard and erected by our own crews.
Most of our tonnage goes into structural frames: factories, warehouses, cold stores, offices and the pipe racks that hold a process plant together. We work from your engineer's design, prepare shop drawings and connection details for approval, then fabricate, blast and coat every member in Shah Alam.
Our own crews erect with our own mobile cranes, to a written method statement and a lifting plan for every lift. You receive a QA dossier at handover with mill certificates, weld inspection records and coating thickness readings for each member.
How a job runs
We take off the tonnage from your drawings and return a priced, itemised quotation.
5 working days
A 3D model, shop drawings and connection details go to your engineer for approval.
2 to 3 weeks
Cut, drilled, welded, inspected, blasted and painted in our yard, then marked for erection.
3 to 10 weeks
Our crews erect, bolt up and touch up on site, then hand over the QA dossier.
2 to 12 weeks
The structure is designed and signed by your project engineer. We provide connection design support, shop drawings and value-engineering suggestions for the engineer to accept or reject.
Our yard produces about 4,800 tonnes a year. Our largest single project so far was 1,240 tonnes, delivered over 26 weeks.
Selected projects
Send your drawings and specification. We acknowledge within one working day and return an itemised quotation, usually within five.